Skip to main content
All articles

Is CMS ending fax for ADRs? What CMS-0053-F means for SNFs

Chris Stobie ·

SNF billing teams can still respond to ADRs by fax, paper mail, CD, or contractor portal. Despite how CMS framed the claims attachment rule in its March 20, 2026 press release, Medicare is not ending those channels for skilled nursing ADR responses.

CMS-0053-F and SNFs

CMS published CMS-0053-F, the administrative simplification rule adopting standards for health care claims attachments, on March 24, 2026. The rule takes effect May 26, 2026, with compliance required by May 26, 2028.

Under CMS-0053-F, electronic attachment transactions must follow X12 275/277 version 6020 along with HL7 C-CDA and the HL7 attachments implementation guide. The rule covers solicited and unsolicited attachments across pre-payment review, adjudication, and post-payment audits. It excludes appeals and prior authorization.

In its March 20, 2026 press release, CMS described the rule as phasing out fax machines and snail mail, while in the rule text CMS states that providers may choose not to conduct these transactions electronically. The standards apply only to transactions a provider conducts electronically.

The Medicare Program Integrity Manual (IOM 100-08, chapter 3, section 3.2.3.5, revised 2026) still states that MACs, CERT, SMRC, and RACs shall accept documents via paper, fax, CD/DVD, esMD, and contractor website portal. CMS-0053-F does not remove those channels.

Where fax and mail break down

By the time a faxed or mailed notice reaches the business office or clinical team, part of the 45-day ADR response window, or 30-day UPIC response window, may have passed.

  • A facility received a faxed TPE notice weeks after its letter date, and the last pages were illegible.
  • Mailed ADR letters with time-sensitive deadlines can arrive after part of the response window has passed.
  • One RAC's portal displays only a tracking grid, so the actual ADR letters must be requested by fax, while that RAC states electronic delivery requires esMD.

When a notice arrives late or missing pages, the MDS coordinator, DON, and biller have less time to pull physician orders, certifications, therapy notes, and UB-04 support. Missing a due date or sending an incomplete packet can result in a technical denial or recoupment.

Why esMD makes sense for skilled nursing

The esMD receipt date counts as the received date. CMS states that ADR letters can be sent via esMD as electronic medical documentation requests (eMDR), which reduces notices sitting in a mailroom or arriving with unreadable fax pages.

RACs pay up to $27 per record for records sent through esMD, compared with $15 per record sent by mail, fax, or CD. Performant, the RAC for Regions 1 and 2, calls esMD its preferred method.

January 2027 esMD change

Facilities that submit through esMD work with a health information handler (HIH), the vendor that sends records to esMD for providers.

CMS will retire the older CONNECT/XDR gateway in esMD production on January 2, 2027, and expects HIHs to finish moving to XDR FHIR by the first week of December 2026. Ask your HIH whether it has finished that move.

Next steps for SNF billing and clinical teams

  • Map which channel each reviewer (MAC, RAC, UPIC, and CERT) uses for each facility.
  • Set up esMD through a health information handler if your buildings send many ADR responses, and ask about eMDR delivery so notices stop depending on fax and mail.
  • Confirm with your current or prospective HIH that it has moved from CONNECT/XDR to XDR FHIR before the gateway is retired on January 2, 2027.
  • Keep a single ADR log shared across the business office and clinical team that tracks the reviewer, received date, and due date.
  • Check fax quality and page counts on each incoming notice the day it arrives, and request a clean copy right away if any page is missing or unreadable.
  • Catch missing certifications, unsigned orders, and MDS mismatches during monthly triple check.

See these checks run on your own claims.

Acuri checks every claim against the MDS, orders, and certifications before it is billed.